View CfT Workspace

CfT: The replacement of existing one pipe central heating system and oil boiler with a more modern two pipe system powered by a sole gas boiler

Name of Contracting Authority:
Scoil Iosagain Infant National School (Mallow)
Title:
The replacement of existing one pipe central heating system and oil boiler with a more modern two pipe system powered by a sole gas boiler
CfT CA Unique ID:
Scoil Íosagáin Infant N.S.
Evaluation Mechanism:
Price/Cost Effectiveness
Description:
The replacement of existing one pipe central heating system and oil boiler with a more modern two pipe system powered by a sole gas boiler at Scoil Iosagain Infant School
Procurement Type:
Works
Directive:
2014/24/EU (Classic)
Procedure:
Open
CfT Involves:
A Public Contract
CPV Codes:
45332200-Water plumbing work
45332000-Plumbing and drain-laying work
71321300-Plumbing consultancy services
45000000-Construction work
45200000-Works for complete or part construction and civil engineering work
45214230-Special school construction work
45214200-Construction work for school buildings
42131110-Central-heating radiator valves
44163121-Heating pipes
Contact Point:
Tim Lenihan
Award per Item:
No
Inclusion of e-Auctions :
No
NUTS codes:
IE IE0
Estimated value (EUR):
90,000
Above or Below threshold:
Below
Time-limit for receipt of tenders or requests to participate:
06/06/2025 00:00
Deadline for dispatching invitations:
End of clarification period:
30/05/2025 00:00
Upload of documents within the clarifications:
No
Tenders Opening Date:
09/06/2025 00:00
Allow suppliers to make an online Expression Of Interest:
Yes
Contract awarded in Lots:
No
Contract duration in months or years, including any options and renewals:
2 months
Validity of Tender in days or months:
14 days
EU funding:
No
Multiple tenders will be accepted:
No
Date of Publication/Invitation:
16/05/2025 17:03
TED links for published notices:
https://ted.europa.eu/udl?uri=TED:NOTICE:322348-202...
Date of Awarding:
Language of publication:
EN
Number of openers:
Two
Contract Award Date:
13/06/2025 00:00
Date Accepted by Contractor:
19/06/2025 00:00