Notice & Tender Documents

CfT: Tender for the supply and installation of an Audio Visual System for The Data Protection Commission, 6 Pembroke Row, Dublin 2

| Displaying: 1-10 | 16 results in total.
Addendum ID
Sort ascendingSort descending
Title
Sort ascendingSort descending
File
Sort ascendingSort descending
Description
Sort ascendingSort descending
Lang.
Sort ascendingSort descending
Document Versions Actions
N/A Bill of Materials (BOM) Bill of Materials.xlsx Tenderers are required to outline their cost proposal by completing the Bill of Materials (BOM). The BOM will capture costs for the following a) The Assisted listening system b) The Canteen system c) The multi-purpose room system (R00-11) and associated AV Room (R00-13) d) Support and Maintenance EN Doc versions
N/A Canteen AV Layout Containment - High 1836_AV05 DPC Pembroke Row 4th Floor Canteen AV Layout Containment High 041024.pdf EN Doc versions
N/A Canteen Containment - low 1836_AV14 DPC Pembroke Row Canteen 4th Floor AV Layout Containment Low 041024.pdf EN Doc versions
N/A Canteen System Schematic 1836_AV02 DPC Pembroke Row Canteen System Schematic 300924.pdf EN Doc versions
N/A Canteen containment socket and height details 1836_AV13 DPC Pembroke Row Canteen 4th Floor Containment, Socket and Heights Detail 041024.pdf EN Doc versions
1 Clarifications to date - 8th November Clarifications on DPC AV Tender issued 8th November.docx The following are clarifications and responses to queries received by the DPC to date. The deadline for any further queries remains the 15th November at 17:00. EN Doc versions
N/A General Services - Canteen area General Services Fourth Floor-Work.pdf General descriptive plan of canteen - for information only EN Doc versions
N/A Ground floor General Services E001 General Services Ground Floor-Work.pdf General descriptive plan of ground floor - for information only EN Doc versions
N/A Mandatory Requirements Mandatory Requirements.docx Tenderers must complete this Mandatory Requirements document, confirming that they fully meet all of the Mandatory Requirements (“MR”) as contained within. EN Doc versions
N/A Multi-Purpose Room AV Elevations 1836_AV17 DPC Pembroke Row MULTI-PURPOSE ROOM R00-11 AV Elevations 030924.pdf EN Doc versions