CfT: Architect/Building M and E Services Led Design Team Consultancy Services
| Displaying all 2 matches.
Addendum ID![]()
|
Title![]()
|
File![]()
|
Description![]()
|
Lang.![]()
|
Document Versions | Actions |
|---|---|---|---|---|---|---|
| 1 | Laois Tender Pack | Laois Tender Pack - Rev 1.zip | Dear tenderer, Please note that the following tender documents have been updated and uploaded to eTenders : 3.5 Project Execution Plan 3.7 Project Brief Previous versions of these documents are now superseded. The revised documents have been updated to include the following requirements (as advised previously): “With the exception of the BER, all other targets must be verified using a Dynamic Simulation Model. The DSM software should meet the minimum requirements of CIBSE TM33 and CIBSE AM11. The task of gathering the information / data required for the Dynamic Simulation Model is included in the project brief and shall be undertaken by the appointed design team” | EN |
|
|